Assembly, Startup
and Training

SOLUTION

  • Each equipment is pre-installed at AMSTs facility where the full integration of the sub-systems including software takes place.
  • After installation, we perform internal tests on subsystems and the whole system with various sensor-feedback systems along the test procedures to ensure fulfilment of all technical parameters and features as specified in the contract.
  • Delivery of the equipment to site will be after successful Factory Acceptance Test (FAT).
  • The procedure comprising pre-assembly, internal tests and FAT together with our customer ensures the fulfilment of the specification before delivered to site.


Benefits

  • It shortens the installation and start-up period on site
  • The customer has all information about the equipment delivered by performing the physical configuration audit
  • The customer has the right to withhold the delivery in case of defects arise during FAT 
  • It saves costs

SOLUTION

Features

ASSEMBLY

ASSEMBLY

Assembly is divided into two phases, pre-assembly at AMST facilities and assembly on-site. Pre-assembly at AMST shows whether all parts and components fit together, and we perform functional tests together with the customer during factory acceptance test (FAT). Only when the FAT is passed the equipment will be disassembled and shipped to the customer’s site.
PACKAGING

PACKAGING

The AMST product and especially sensitive equipment is carefully packed. The package is equipped with shock sensors and sensors for temperature and humidity to identify the reason for any damage during transportation and to assure a safe transportation. AMST is caring out these tasks with specialised companies that have detailed knowledge in the fields of packaging.
TRANSPORT

TRANSPORT

We ship the equipment from our factory to the contractor’s designated site location. We prepare the equipment for delivery in accordance with standard practices for transportation and logistics, marked in accordance with the requirements as stipulated contractually.
STARTUP

STARTUP

Within this phase, all subsystems are installed onsite and assembled. The AMST start-up tests comprises the subsystems and whole system including final adjustment of sensor systems and tests concerning all safety aspects to ensure a safe operation of the delivered AMST equipment including all safety features installed in the building to ensure a safe operation.
TRAINING

TRAINING

It is part of AMST’s policy to ensure that the customer can correctly operate and maintain the systems and can make full use of all its potential. The AMST training comprises:
- Instructor training
- Operator and administrator training
- Maintenance training